Page not found
Search results
-
2023 Electric Security Light Rates
Public Utilities | PageEffective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...
-
Data Request
Police | PageData not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the data subject and to anyone authorized ...
-
Community Development Fee Schedule
Community Development | PageDoor (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40 ... Commercial Demolitions (3-27-06) $40.00* $1.00 $41.00 Fireplaces & free standing stoves (Gas or Wood) ...
-
2022 Cost of Service Studies
Public Utilities | Pageprojected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...
-
Structural Engineers Reports
Administration | PageConsulting Engineers L.L.P. Structural, Civil and Forensic Engineering Services November 6, 2017 Mr. John ... attend a meeting to present this information on 11-8-2017 (and be available for questions). The original ... approximately 40 feet by adding two new trusses and roof purlins. A large addition including an additional East ...
-
Permit Fee Calculator
Community Development | Page$0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...
-
Sales Tax Fact Sheet
Administration | PageAnoka County 10/1/2017 Beltrami County 4/1/2014 Carlton County 4/1/2015 Carver County 10/1/2017 Dakota ... County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ...
-
Itasca Clean Energy Solar Plus Battery Storage Project
Public Utilities | PageZiegler Cat lithium ion battery. • Began operating in October 2022. • Operated by a comprehensive ... cityofgrandrapidsmn.com/utilities Facebook: grpucmn 06.16.2023 ...
-
2023 City Water Rates
Public Utilities | PageGallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ...
-
Public Utilities Financial Reports
Public Utilities | Pageeffluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... (cont.) Realign tasks for information systems which focus internally on exporting data from current and ... customer wastewater by the GRPUC. Total operating expenses decreased by $625,838, or 2.40%, over the ...