Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  2. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    wq-strm4-49a • 9/ /20 Page 12 of 32 MCM 4: Construction site stormwater runoff control • 651-296-6300 ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  4. Sales Tax Fact Sheet

    Administration | Page

    0.50% Willmar Sales and Use Tax 10/1/19 1/1/0612/31/12 0.50% 0.50% 8 Minnesota Revenue, Local Sales ... Anoka County 10/1/2017 Beltrami County 4/1/2014 Carlton County 4/1/2015 Carver County 10/1/2017 Dakota ... County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ...

  5. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... negotiate this component of the building permit fee with the project owner/developer. (revised 4-12 ...

  6. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ...

  7. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2X6 ... 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x10 3-2x12 12’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 ...

  8. Public Utilities Financial Reports

    Public Utilities | Page

    expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...

  9. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... must be attached with a minimum of 6d nails at 12 inches on center.  4X8 structural fiberboard ...

  10. Capital Improvements: Street Reconstruction Plan

    Engineering / Public Works | Page

    2017-2021 to identify potential street reconstruction projects and their funding sources. The Plan is ... included for the years 2017-2021 are proposed projects and will be evaluated during budget cycles. In light ... Utilities (1st Street SW, 12th Avenue SW, 11th Avenue SW and 10th Avenue SW) City Project 2015-1 January 9, ...

Pages