Page not found

Search results

  1. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    (cont.)  Realign tasks for information systems which focus internally on exporting data from current and ... Operator 2021-12-03 Organizational Chart Maintenance III xii FINANCIAL SECTION xiii Independent ... expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ...

  3. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... on xx/xx/03 City of Grand Rapids Data Access Procedures Introduction These procedures are adopted to ... stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  5. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...

  6. Decks

    Community Development | Page

    11 10 ½” DIAM. BOLT WITH 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ... 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. SHEATHING AND ½” STACKED ...

  7. Basic Wood Framing

    Community Development | Page

    attic assembly supported by 2 × 4 studs is limited to a roof span of 32 feet. Where the roof span ... exceeds 32 feet, the wall studs shall be increased to 2 × 6 or the studs shall be designed in accordance ... SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ...

  8. Financial Reports

    Finance | Page

    Sheet- Nonmajor Special Revenue Funds Statement 21 122 Subcombining Statement of Revenues, Expenditures ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ... significant interest. As an example, the 48-unit apartment was fully leased 8 weeks prior to opening. ...

  9. Special Assessments

    Engineering / Public Works | Page

    R-4, and SR-4, shall be assessed 100% of a typical 32 foot wide urban residential street. See Appendix ... Typical Construction Items (TCI) method at a rate of 30% of a typical 32 foot wide residential street. ... method at a rate of 30% of a typical 32 foot wide residential street. Rural residential properties shall ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Antonsen, Project Manager, Springsted Type: Agenda Item Status: CC Worksession File created: 6/21/2012 In ... Agenda Item Status: CC Worksession File created: 6/21/2012 In control: City Council Work Session On ... 1 Name: Type: Agenda Item Status: CC Worksession File created: 6/21/2012 In control: City Council Work ...

Pages