Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  2. Complete Application Packet: Off-sale

    Administration | Page

    Background Check form Fillable PDF 4. MN Worker's Comp Fillable PDF Check Box11: Check Box12: Check ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22 ... Please fill in the following information and return this form along with your application to the agency ...

  3. Decks

    Community Development | Page

    8’ 10’ 12’ 14’ 16’ 18’ Southern Pine 2-2X6 7’1” 6’2” 5’6” 5’0” 4’8” 4’4” 4’12-2X8 9’2” 7’11” 7’1” ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’10” 3’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1 ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ...

  6. Financial Reports

    Finance | Page

    Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... Statement 4 41 Reconciliation of the Statement of Revenues, Expenditures and Changes in Fund Balances of ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  7. Garages: One Story

    Community Development | Page

    (at least 1/8” = 1 ft. min.). They may be on 8 ½ X 11 paper. Plans must include a site plan, floor ... to have a 4:1 aspect ratio. For narrower wall segments, see page 6 of this handout. ROOF TRUSSES Wood ... a garage are:  Footing and foundation inspections after form work and reinforcement is in place but prior ...

  8. Special Assessments

    Engineering / Public Works | Page

    Council on November 11th, 1993 and amended most recently on December 8th, 2008. LMC Special Assessment ... ASSESSMENT POLICY Date: Adopted: November 11, 1993 Amended: April 26, 2004 Amended: October 24, 2005 Amended: ... such properties. All developers shall be required to provide collateral in the form of cash, or ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Initial Procedural Forms  a. Pre‐application Report Request  b. Pre‐application Report  c. ... Energy Storage Application  3. Supplemental Agreement Forms  a. Supplemental Review Offer  b. System Impact Study Agreement  ... c. Facility Study Agreement  d. Transmission System Impact Study Agreement  4. Final Agreement Forms ...

Pages