Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16c ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 2424 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  2. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ... Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  4. Decks

    Community Development | Page

    12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” Joists must bear ... 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” 3 MAXIMUM POST HEIGHT IN FEET SPECIES SIZE ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  5. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  6. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... is shown at the end of Exhibit 2-A and in Table 2-4 below. A projected strong net income in 2022 is ... million or 16.3 percent of operating revenues. Projected Operating Results – Existing Rates- 7- Table 2-4 ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 09/24/12 04:00pm

    ecl MN Child Passenger Safety Program 24l2017 Apply Receive up to 10 child safety seats Police not ... Attachments: 9-24-12 Attachment 8& 10 Hanqer TKDA.pdf 5:55 ADMINISTRATION DEPARTMENT p.m. 15. 12-0581 ... and the seal of the City of Grand Rapids, Minnesota, this 24' day of September Two thousand ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

Pages