  1. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 3-2X10 6-2 (2) 5-9 (2) 5-4 (2) 5-1 (2) 3-2X12 7-2 (2) 6-9 (2) 6-3 (2) 5-11 (3) 4-2X8 6-1 (1) 5-8 (2) 5-3 ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  2. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2X6 ... 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 2-2x12 3-2x10 3-2x12 12’ 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 ...

  3. Garages: One Story

    Community Development | Page

    2-2X12 2 7-6 2-2X12 2 7-0 3-2X10 2 6-4 3-2X10 2 6-8 3-2X8 2 8-2 3-2X12 2 7-4 3-2X12 2 8-2 3-2X10 2 8-2 ... 4-2x10 2 8-2 4-2X10 2 9-5 3-2X12 2 9-5 4-2X12 2 8-5 4-2x12 2 Over 12 ft *EWPR *EWPR Over 10 ft *EWPR ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...

  4. Capital Improvements: Street Reconstruction Plan

    Engineering / Public Works | Page

    Utilities (1st Street SW, 12th Avenue SW, 11th Avenue SW and 10th Avenue SW) City Project 2015-1 January 9, ... BACKGROUND AND SCOPE The project involves pavement rehabilitation of 12th Avenue SW, 10th Avenue SW and the ... bituminous pavement placed. 12th Avenue SW will remain 30’ face to face and 10th Avenue SW will remain 37’ ...

  5. Fasteners

    Community Development | Page

    6 12 19/32 – 1 8d common nail 6 12 1 1/8 – 1 ¼ 10d common nail or 8d deformed nail 6 12 a. All nails ... ⅛ 3/32 #10 ⅜ 3/16 ⅛ 7/64 #11 ½ 3/16 5/32 9/64 #12 ½ 7/32 9/64 ⅛ Corrosion Resistant Nails Stainless Steel ... d 24” o.c. Built-up girders and beams, 2-inch lumber layers 10d Nail each layer as follows: 32” o.c. at ...

  6. Public Utilities Financial Reports

    Public Utilities | Page

    expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  7. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ...

  8. Footings, Foundations & Slabs

    Community Development | Page

    over light frame or 8-inch hollow concrete masonry 1-story 12 12 12 2-story 21 16 12 3-story 32 24 16- ... 8 8 6 solidd or 8 10 6 4 5 6 6 solidd or 8 6 solidd or 8 8 6 solidd or 8 8 10 6 solidd or 8 10 12 ... 7 4 5 6 7 6 solidd or 8 6 solidd or 8 10 12 8 10 12 10 solidd 8 10 10 solidd 12 solidd 8 4 5 6 7 8 6 solidd or ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ... /14/2022 Wastewater Cost of Service Study- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web Page Menu ...

  10. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    10 of 32 (Note: All or some of this item is a new permit requirement. Compliance with new ... wq-strm4-49a • 9/ /20 Page 12 of 32 MCM 4: Construction site stormwater runoff control • 651-296-6300 ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ...